Appendix 8 · Practical Example
When Excellent Manufacturing Cannot Deliver the Customer Promise
1. Executive Summary
A $65 million specialist manufacturer produced sophisticated signage but repeatedly failed to deliver complete installation kits. Gary Newbury identified weaknesses in component traceability, warehouse accountability and performance visibility. Working with a manufacturing consultant, he helped increase complete and on-time fulfilment from 20% to over 80% within weeks and developed a commercially justified warehouse redesign.
2. Context and Need for Intervention
The manufacturer supplied complex signage and fascias for major customer-facing brands (main street retailers, national fuel chains, and financial institutions). Its advanced production capabilities supported both standard and highly customized components.
Yet installation crews frequently arrived without the materials needed to proceed. Deliveries might contain substantial quantities of stock, but not the right combination for the scheduled work.
Individual installations could require thirteen shipments. Project managers chased missing components, organized additional deliveries and handled increasingly frustrated customers.
The CFO engaged Gary to establish why fulfilment was failing and what needed to change.
3. Establishing Reality
Gary examined how components and information moved between manufacturing, warehousing and dispatch. Three weaknesses emerged:
Identification and traceability: customer-specific components could not be reliably distinguished and tracked through fulfilment.
Fragmented responsibility: inbound and outbound warehouse activities occupied separate chambers divided by a wall, with insufficient integration.
Poor performance visibility: management lacked dependable measures of complete fulfilment, line fill and dispatch performance.
A component could exist without the business being able to identify, locate and allocate it to an installation. Employees compensated through searching, chasing and repeated shipments.
Gary recognized that improving dispatch alone would leave the underlying weakness intact. Control had to extend from manufacturing to the complete customer requirement.
A component is not ready for the customer merely because manufacturing has finished making it.
4. Findings and Strategic Alignment
The CFO sponsored the diagnostic and design assignment. Another consultant was addressing manufacturing improvements, and Gary worked with him on control of specialist components crossing into warehouse accountability.
Gary established a tracking arrangement supported by an administrative employee maintaining a central record from operational paperwork. This provided immediate visibility without waiting for major capital expenditure.
Gary separated that practical interim measure from the longer-term requirement: an integrated warehouse operation with less dependence on manual intervention.
5. Intervention and Operating Changes
The immediate spreadsheet-based control recorded what had been produced, transferred and required for each installation. Improved coordination and measurement helped the business assemble more complete, site-ready kits.
Gary also developed a warehouse redesign integrating inbound and outbound activity, revising storage and material movement, and incorporating physical alterations within the existing building.
The design projected a 180% increase in usable storage cube without expanding the footprint. Gary established the operating processes, staffing assumptions and productivity model needed to support it.
The $125,000 investment case projected annual savings of $125,000 and a one-year payback. He presented the design and commercial justification to the CFO.
6. Results and Transfer
Complete and on-time fulfilment rose from 20% to more than 80% within weeks. Line fill exceeded 90%, and installation crews became more productive.
These measured improvements demonstrated that better information and coordination could materially improve customer delivery before capital investment.
The assignment also delivered a warehouse design, operating concept and quantified investment case for client-led implementation.
Client testimonial
“Gary brought clarity and discipline to an area we knew was underperforming. His approach gave us a clear plan, hard measures, and immediate results.”
Chief Financial Officer, client organization
7. What This Practical Example Demonstrates
The weakness lay in connecting capable manufacturing to the complete customer requirement. Gary established immediate control and designed an integrated operation to address the structural causes.
The customer experiences the whole operation, including the gaps between otherwise capable functions.
Intervention Pathway: RADAR with targeted operational improvements and fulfilment redesign.Delivery Model: Gary-led investigation and design; collaborative implementation of interim controls; subsequent warehouse redevelopment client-led.