Appendix 12 · Practical Example
When More Warehouses Were Not the Answer
1. Executive Summary
A retailer with 270 stores and $4 billion in annual revenue opened 16 temporary warehouses for a two-week $70 million furniture promotion. The campaign failed because stock could not flow reliably to stores. Gary Newbury investigated the network, established a $100 million inventory improvement opportunity and implemented a specialist storage redesign that released needed capacity in the national distribution centre.
2. Context and Need for Intervention
Promotional peaks were foreseeable, yet the operating model could not accommodate them reliably.
The temporary warehouses lacked independent store-fulfilment systems. Goods were recorded at the national distribution centre, moved to remote buildings and recalled manually for processing and dispatch. More buildings brought additional handling, transport and administration while preserving the central bottleneck.
The temporary sites had ceased operating before Gary joined a specialist consulting team. His mandate was to establish the weaknesses behind the failure and develop a better operating model for future promotions.
3. Establishing Reality
Gary measured 125,000 storage locations across five facilities and reconciled their dimensions with system records. Removed or repositioned beams and inconsistent settings meant recorded capacity differed from usable physical space.
He analysed 16,000 products, checked important product dimensions and connected pallet sizes with sales rates, order quantities and inventory holdings.
Three weaknesses emerged:
Unreliable planning information: physical capacity and system records did not consistently agree.
Poor inventory and space allocation: purchasing and storage decisions consumed capacity inefficiently.
Compensating arrangements: temporary buildings and manual controls accommodated weaknesses without correcting them.
A range of 900 lighting products occupied 24% of the national centre’s storage cube. The question was how the network used its space, not simply how much it possessed.
Additional capacity can conceal poor resource utilization while making the resulting complexity more expensive to manage.
4. Leadership and Decision Rights
Working within the consulting team, Gary developed the operating evidence and storage blueprint. He challenged further building commitments before the existing estate had been measured and redesigned.
He also directly supervised selected physical changes where accurate execution of the design determined whether the expected capacity would materialize.
5. Intervention and Operating Changes
Gary designed a denser configuration for the lighting range at a specialist facility. Unequal beam heights accommodated different pallet profiles, and picking and reserve stock shared locations where movement rates and purchasing quantities justified it.
When installers began setting beams at uniform heights, he intervened to restore the specified arrangement and product-loading plan. The racking was reconfigured and the stock relocated during the assignment.
His inventory model identified $100 million of dead, slow-moving, excess or inefficiently deployed stock. Recommendations included rebalancing holdings and directing clearance promotions at affected products. Early client action began.
Gary developed a reusable planning tool to test whether the national distribution centre could accommodate promotional inventory at its peak, using expected inbound quantities and product characteristics. The wider work also examined replenishment and delivery arrangements intended to reduce handling in stores.
6. Results and Transfer
The intervention delivered a physically verified capacity baseline, a documented $100 million inventory improvement opportunity and an operating blueprint.
Analysis identified capacity potential equivalent to 250,000 square feet and an initial $5 million potential network-rebalancing benefit.
The specialist storage redesign and lighting relocation were completed, releasing capacity in the national centre. The forward planning tool gave management a means to assess future storage requirements for its promotions. Wider inventory and network changes were prepared for client-led implementation.
Client testimonial
“His meticulous mapping of physical storage and SKU-level analysis identified major issues in system data, overstocking, and slot inefficiencies. We found Gary Newbury tenacious, analytically sharp, and laser-focused on keeping the client aimed at the real problems.”
Managing Director, specialist management consulting firm
7. What This Practical Example Demonstrates
The promotion exposed weaknesses embedded in everyday information, purchasing and storage decisions. Gary established the physical reality, designed a different use of existing capacity and implemented a critical part of the solution.
The first capacity decision is whether the organization is using its existing assets well enough to justify buying more.
Intervention Pathway: Operating Model Transformation.Delivery Model: Gary-led specialist investigation and design, with direct supervision of selected implementation projects; wider inventory and network implementation client-led.