1. Executive Summary

A logistics provider approached insolvency despite substantial demand. Its principal warehouse was losing more than $125,000 a month as congestion and service failures escalated. Appointed Interim COO, Gary Newbury challenged the business being accepted and rebuilt its commercial and operating arrangements. Within six months, monthly performance reached $125,000 net profit, representing a $3 million annualized turnaround.

2. Context and Need for Intervention

The company generated $15 million annually, including $5 million from a 125,000-square-foot public warehouse. Management had accumulated 33 customers with conflicting storage, picking and transport requirements.

A major food ingredients customer required 4,500 pallet positions and rapid onward dispatch. The warehouse normally received on day one, processed on day two and dispatched on day three.

More than 20 trailers could wait to unload product required for customer orders. Pallets blocked aisles and operatives repeatedly moved inventory to reach and select other inventory. Additional effort increased costs without restoring control.

3. Establishing Reality

Gary had previously helped the company with an automotive replenishment assignment to an OEM producer. Returning to investigate the crisis, he examined customer rates, physical flows, working practices and financial information.

Three weaknesses explained the deterioration:

Operating economics: prices failed to reflect handling complexity and service cost; direct wages had reached 55% of revenue, and actual volumes differed from the original commitments.

Operating capability: uncontrolled receiving, obstructive racking and poorly coordinated system instructions generated congestion and wasted movement.

Commercial alignment: incompatible customer requirements consumed capacity without adequate returns.

Financial reporting blind spots and control irregularities compounded the problem. The board lacked timely, dependable information.

A full warehouse is not evidence of a viable business when the work inside it costs more to deliver than customers are paying.

4. Leadership and Decision Rights

Before taking executive responsibility, Gary asked the owners: “What’s variable here?”

The question established whether customer agreements, pricing, management positions and operating practices were genuinely open to change. With that support, he accepted Interim COO authority.

He engaged employees in practical improvements while holding managers accountable. Financial leadership was reset and stronger reporting established.

5. Intervention and Operating Changes

Commercial reset. Gary challenged the largest customer’s pricing and service expectations. The directors endorsed revised terms, which he presented personally despite the risk of losing the contract. The customer accepted.

Other customers were repriced, relocated or exited. The portfolio fell from 33 to seven, focused increasingly on compatible food ingredients activity. Gary also helped move the automotive customer into a facility suited to its different requirements.

Operating redesign. He reclaimed tenant space for receiving, scheduled arrivals, introduced inspection arrangements and removed obstructive racking. The warehouse was reorganized for controlled flow rather than maximum nominal occupancy.

Working with operatives and the software developer, Gary introduced directed movements and coordinated forklift tasks to significantly reduce empty travel. Pickup and delivery stations, zoning and combined task cycles aligned systems with physical working methods.

Management control. Weekly management accounts and daily operating statistics connected activity to financial performance. Recovery and redesign progressed concurrently while the business continued trading.

6. Results and Transfer

Within six months, the changes delivered:

Financial recovery: monthly losses exceeding $125,000 became $125,000 net profit, a $3 million annualized improvement.

Productive capacity: throughput increased from 400 to 800 pallets per day, occasionally more.

Labour economics: direct wages fell from 55% to 21% of revenue; $2 million in annual labour-productivity improvement contributed to the turnaround.

Commercial focus: the customer portfolio reduced from 33 to seven.

Operating discipline: receiving, handling and dispatch controls supported advanced food-safety accreditation.

On later visits under separate mandates over several years, Gary found the redesigned arrangements still operating effectively.

Client testimonial

“Gary’s leadership in transforming our operations was invaluable. The turnaround exceeded our expectations, not only improving profitability but also positioning us as a key player in the food logistics sector. His ability to act quickly and decisively saved our business.”

Chief Executive Officer, logistics provider

7. What This Practical Example Demonstrates

Recovery required authority to change which work the business accepted, what it charged and how it delivered. Better execution alone could not make incompatible commitments commercially sound.

Gary restored control while redesigning the mechanisms producing the losses.

A durable recovery changes the conditions producing failure, including the commercial commitments the operating model must fulfil.

Intervention Pathway: RPR to OMT, with overlapping recovery and structural redesign.Delivery Model: Gary-led recovery, design and implementation under Interim COO authority.

Gary Newbury
Senior Interim Executive — Reliable Performance Recovery & Operating Model Transformation